{"id":9833,"date":"2024-12-12T17:14:21","date_gmt":"2024-12-12T17:14:21","guid":{"rendered":"https:\/\/eeegr.com\/?p=9833"},"modified":"2024-12-12T17:16:16","modified_gmt":"2024-12-12T17:16:16","slug":"waves-group-supports-orsted-in-delivering-foundations-for-gode-wind-3-offshore-wind-farm","status":"publish","type":"post","link":"https:\/\/eeegr.com\/2024\/12\/12\/waves-group-supports-orsted-in-delivering-foundations-for-gode-wind-3-offshore-wind-farm\/","title":{"rendered":"Waves Group supports \u00d8rsted in delivering foundations for Gode Wind 3 Offshore Wind Farm"},"content":{"rendered":"
As Marine Warranty Surveyors (MWS), Waves Group Ltd<\/a> is delighted to have supported \u00d8rsted<\/a> in the successful delivery of the offshore platform and 23 foundations for the Gode Wind 3 Offshore Wind Farm turbines and Offshore Substation (OSS) and 83 foundations for the Borkum Riffgrund 3 Offshore Wind Farm. As Marine Warranty Surveyors (MWS), Waves Group Ltd is delighted to have supported \u00d8rsted in the successful delivery of the offshore platform and 23 foundations for the Gode Wind 3 Offshore Wind Farm turbines and Offshore Substation (OSS) and 83 foundations for the Borkum Riffgrund 3 Offshore Wind Farm. This achievement showcases the exceptional collaboration […]<\/p>\n","protected":false},"author":4296,"featured_media":9836,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","_eb_attr":"","ub_ctt_via":"","advgb_blocks_editor_width":"","advgb_blocks_columns_visual_guide":"","footnotes":""},"categories":[54,53],"tags":[39,309],"class_list":["post-9833","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-member_news","category-news","tag-offshore-wind","tag-waves-group"],"acf":[],"featured_image_src":"https:\/\/eeegr.com\/wp-content\/uploads\/2024\/12\/image-2.jpg","author_info":{"display_name":"Will Norris","author_link":"https:\/\/eeegr.com\/author\/will-norriseeegr-com\/"},"author_meta":{"display_name":"Will Norris","author_link":"https:\/\/eeegr.com\/author\/will-norriseeegr-com\/"},"featured_img":"https:\/\/eeegr.com\/wp-content\/uploads\/2024\/12\/image-2-640x480.jpg","coauthors":[],"tax_additional":{"categories":{"linked":["Member News<\/a>","News<\/a>"],"unlinked":["Member News<\/span>","News<\/span>"]},"tags":{"linked":["offshore wind<\/a>","waves group<\/a>"],"unlinked":["offshore wind<\/span>","waves group<\/span>"]}},"comment_count":"0","relative_dates":{"created":"Posted 2 months ago","modified":"Updated 2 months ago"},"absolute_dates":{"created":"Posted on 12 December 2024","modified":"Updated on 12 December 2024"},"absolute_dates_time":{"created":"Posted on 12 December 2024 17:14","modified":"Updated on 12 December 2024 17:16"},"featured_img_caption":"","series_order":"","_links":{"self":[{"href":"https:\/\/eeegr.com\/wp-json\/wp\/v2\/posts\/9833","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eeegr.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/eeegr.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/eeegr.com\/wp-json\/wp\/v2\/users\/4296"}],"replies":[{"embeddable":true,"href":"https:\/\/eeegr.com\/wp-json\/wp\/v2\/comments?post=9833"}],"version-history":[{"count":3,"href":"https:\/\/eeegr.com\/wp-json\/wp\/v2\/posts\/9833\/revisions"}],"predecessor-version":[{"id":9841,"href":"https:\/\/eeegr.com\/wp-json\/wp\/v2\/posts\/9833\/revisions\/9841"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eeegr.com\/wp-json\/wp\/v2\/media\/9836"}],"wp:attachment":[{"href":"https:\/\/eeegr.com\/wp-json\/wp\/v2\/media?parent=9833"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/eeegr.com\/wp-json\/wp\/v2\/categories?post=9833"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/eeegr.com\/wp-json\/wp\/v2\/tags?post=9833"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}
This achievement showcases the exceptional collaboration and expertise across our offices in Southampton, London and Singapore. Our contributions to the project included:<\/p>\n\n\n\n
– Attending various monopile (MP) and secondary steel (SS) loadouts and installations
– Approving the OSS loadout and installation
– Managing and approving numerous jack-up rig (JU) moves
– Approving multiple tug and tow sailaways
– Conducting over 30 vessel suitability surveys to ensure the safe and efficient operation of project vessels.
Together, the Gode Wind 3 and Borkum Riffgrund 3 Offshore Wind Farms will boast a combined capacity of over 1.1 GW, capable of supplying renewable power to approximately 1.2 million German households.<\/p>\n\n\n\n<\/figure><\/div>","protected":false},"excerpt":{"rendered":"